人人狠狠综合久久亚洲婷婷-人人九九-人人九九精-人人九九精品-人人看操-人人看人莫人人爱免费看

Hotline
+86 15993886110
林州鳳寶高能材料科技有限公司
林州鳳寶高能材料科技有限公司
林州鳳寶高能材料科技有限公司
News Your current location:Home > News
Correct construction sequence of cathode carbon block, refractory brick and refractory castable for aluminium reduction cell

Aluminum electrolysis cell is the main thermal equipment in aluminium electrolysis production. There are many electrolytic cells in the aluminium electrolysis workshop. The construction of furnace construction is often carried out in parallel or cross with other professional projects. In order to gain time to speed up the progress of the project and to centralize and timely supply of various materials and energy, several electrolyzers are usually constructed at the same time. Each electrolyzer has many construction processes, and the links between them are close. Construction and preparation of carbon materials need to ensure a certain humidity, but also consume a large amount of compressed air and electricity. Therefore, the preparation work of material transportation, compressed air and electricity supply should be done well before construction.


Construction of Aluminum Electrolytic Cell

The construction of electrolyzer should start from one end of the workshop and organize the flow-line operation according to the construction process of each electrolyzer. Before lining the electrolyzer, the production of cathode carbon block group should be carried out in advance. The construction of electrolyzer and the production of cathode carbon block are carried out according to the following procedures, as shown in Fig. 1 - 3.



Before the construction of the electrolyzer, the cathode carbon blocks and coarse seam paste are transported by car from the carbon material warehouse to the assembly yard of the electrolyzer overhaul workshop, then unloaded by forklift truck to the assembly platform and heated in the kneading pot. At the same time, after rust removal, the heated cathode steel rod is hoisted to the assembly platform by a bridge crane. The qualified cathode carbon block group is repaired and inspected. It is transported to the electrolysis cell of the electrolysis workshop by automobile. It is installed by bridge crane and hoisting frame. Clay refractory bricks, heat insulation products and side carbon block are transported to the open space of the electrolysis workshop by automobile, and then stacked on the operating platform near each electrolysis cell by bridge crane. The heated rough seam paste is put into the paste box and pulled to the electrolysis workshop by car for reserve.

Before tamping, the vertical seam between the bottom carbon block group and the seam between the carbon block group and the side carbon block can be put into the seam by 4-5kW tubular or chip heater to heat it to the required temperature. If the local temperature is not enough after heating, the light oil heater can be used for local heating.

After the anode carbon block group is manufactured in the anode assembly workshop, it is transported to the electrolysis workshop by an anode tray truck and installed by a multi-energy bridge crane. Other auxiliary materials and powder can be transported by trolley.


豫公網(wǎng)安備41058102000350號

Message
Contact
Scan

Scan

Top
久久精品国产一区二区三区 | 国产精品人人做人人爽人人添 | 亚洲欧洲日产国码av系列天堂 | 国产高清一区二区三区视频 | 国产丝袜无码一区二区三区视频 | 1024在线看片 | 久久久久人妻一区精品 | 老妇女性较大毛片 | av中文字幕潮喷人妻系列 | 无码国模国产在线观看 | 无码人妻精品一区二区三区不卡 | 91在线视频在线 | 超薄肉色丝袜一二三四区 | 97视频免费看 | 日韩精品无码一本二本三本色 | 国产成人精品一区二区免费 | 免费观看a级毛片 | 国产精品国产三级国av在线观看 | 中国国语毛片免费观看视频 | 国产一区二区在线视频 | 在熟睡夫面前侵犯我在线播放 | 精品人妻va出轨中文字幕 | 国产丝袜美女福利视频 | 无套内射极品少妇chinese | 国产精品丝袜黑色高跟鞋 | 亚洲成av人在线观看天堂无码 | 疯狂添女人下部视频免费 | 一本久久综合亚洲鲁鲁五月天 | 国产美女精品一区二区三区 | 88国产精品视频一区二区三区 | 人妻无码一区二区三区 | 日韩人妻无码精品久久免费一 | 久久99精品国产麻豆不卡 | 一本一本久久aa综合精品 | 亚洲字幕av一区二区三区四区 | 中文字幕人妻av一区二区 | 白嫩少妇激情无码 | 日韩中文字幕免费视频 | 欧美日韩精品久久久久 | 亚洲av无码精品色午夜蛋壳 | 日韩欧美人妻一区二区三区 |